PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor detention cell door frames Facing North-West.jpg 3rd floor Electrical split wire above the ceiling facing East.jpg 3rd floor interior electrical roughing Facing East.jpg Column Line E-1 2nd Floor.jpg Installed VAV boxes at the 2nd floor.jpg Installing metal framing at the 3rd floor Facing North-East.jpg VAV Boxes 1.jpg VAV Boxes 2`.jpg
Previous pageNext page Column Line E-1 2nd Floor
Column Line E-1 2nd Floor